China Everbright Greentech Limited ("Everbright Greentech") is listed on the Main Board of the Stock Exchange of Hong Kong Limited. As at 30 June 2019, Everbright Greentech had 107 projects, including 52 integrated biomass utilisation projects, 45 hazardous and solid waste treatment projects, 7 solar energy projects, 2 wind power projects and an acquired company that focuses on environmental remediation, all of which command a total investment of approximately RMB28.305 billion. The aggregate annual designed processing capacity of biomass raw materials was 8.82 million tonnes; the annual household waste processing capacity was approximately 3.41 million tonnes; the annual hazardous and solid waste treatment capacity stood at approximately 1.84 million tonnes; the annual on-grid electricity generation was approximately 7.2 billion kWh; and the annual heat supply was approximately 2.71 million tonnes. In addition, Everbright Greentech has undertaken a total of 24 environmental remediation services, with a total contract value of approximately RMB656 million.

Projects in Operation

Project Annual Treatment
Capacity (tonnes)
Total Investment
(RMB Million)
Jiangsu Province
Suzhou Hazardous Waste Landfill Project 40,000 114
Suqian Hazardous Waste Landfill Project Phase I 20,000 99
Lianyungang Hazardous Waste Incineration Project (Phase I) 2,600 26
Lianyungang Hazardous Waste Incineration Project (Phase II) 10,000 182
Guanyun Hazardous Waste Landfill Project 20,000 139
Binhai Hazardous Waste Landfill Project 30,000 186
Xinyi Hazardous Waste Integrated Treatment Project Phase I 10,006 100
Xinyi Hazardous Waste Landfill Project Phase I 20,000 166
Xinyi Animal Carcass Harmless Treatment Project 3,000 18
Changzhou Hazardous Waste Incineration Project 30,000 329
Jiangyin Zhongxin Resource Recyclying Company Limited 10,000 180
Kunshan Zhonghuan Industrial Company Limited 21,000
Shandong Province
Zibo Hazardous Waste Incineration Project (Phase I) 9,830 132
Zibo Hazardous Waste Incineration Project Phase II 33,000 276
Linshu Hazardous Waste Incineration Project Phase I 20,000 262

Suzhou Hazardous Waste Landfill Project has a combined designed annual hazardous waste treatment capacity of 40,000 tonnes. The project is the first hazardous waste treatment project invested by Everbright Environment, and the largest hazardous waste landfill site in scale to have completed construction in Jiangsu Province.

Suqian Hazardous Waste Landfill Project has a designed annual hazardous waste treatment capacity of 20,000 tonnes. It is one of the key projects in Suqian City.

Lianyungang Hazardous Waste Incineration Project have a combined designed annual hazardous incineration and treatment capacity of 11,650 tonnes. Phase I of the project treats medical waste through high temperature steaming, while phase II of the project focuses on processing industrial hazardous waste through incineration. The project is Everbright Environment's first hazardous waste project adopting high temperature steaming sterilisation equipment for the safe treatment of medical waste.

Guanyun Hazardous Waste Landfill Project has a designed annual hazardous treatment capacity of 20,000 tonnes. It is a hazardous solid waste treatment demonstration project in northern Jiangsu Province that Everbright Environment has invested in.

Binhai Hazardous Waste Landfill Project has a designed annual hazardous treatment capacity of 30,000 tonnes. It has the largest capacity among all hazardous landfill sites that Everbright Environment has made one-off investments in across China. The total landfill capacity of the project is 600,000 m3.

Xinyi Hazardous Waste Integrated Treatment Project Phase I has a designed annual hazardous treatment capacity of 9,500 tonnes. It is Everbright Environment's first hazardous waste treatment pilot project that has arranged tender requests for treatment techniques in bundle, treatment techniques facilities and facilities installation.

Xinyi Animal Carcass Harmless Treatment Project is designed to treat around 3,000 tonnes of dead and diseased animals every year. As Everbright Environment's first project of this type, the project adopts high temperature sterilisation and dehydration techniques. Waste water, sewage and odor produced from the project are processed by the company's existing hazardous solid waste treatment project in the city, which develops a synergistic effect between the two projects.

Changzhou Hazardous Waste Incineration Project has a designed annual hazardous waste incineration capacity of 30,000 tonnes. Located in the Binjiang Industrial District of Xinbei District in Changzhou City of Jiangsu Province, the project is the first hazardous waste treatment joint-venture project jointly invested and established by Everbright Greentech and SUEZ NWS Limited.

Zibo Hazardous Waste Incineration Project Phase I and II has a designed hazardous treatment capacity of 42,800 tonnes. Phase I of the project is Everbright Environment's first project adopting a market-oriented operation model. It is also the first project in China to utilise incineration technology in the hazardous integrated treatment process.

Projects Completed Construction

Project Annual Treatment
Capacity (tonnes)
Total Investment
(RMB Million)
Zhejiang Province
Lishui Industrial Solid Waste Integrated Treatment Project 7,000 106

Projects in Construction

Project Annual Treatment
Capacity (tonnes)
Total Investment
(RMB Million)
Jiangsu Province
Suqian Hazardous Waste Landfill Project Phase I Expansion 6,000 551
Guanyun Hazardous Waste Landfill Project Phase II 10,000 176
Binhai Hazardous Waste Landfill Project Phase II 10,000 139
Binhai Hazardous Waste Incineration Project 30,000 329
Shandong Province
Linshu Hazardous Waste Landfill Project Phase I 20,000 149
Anhui Province
Dingyuan Hazardous Waste Incineration Project Phase I 30,000 355