As of 30 June 2021, everbright greentech had invested in 131 projects with a total investment of approximately RMB32.432 billion. These projects are designed to have an annual biomass raw material processing capacity of 8,089,800 tonnes, an annual household waste processing capacity of 3,777,750 tonnes, and an annual hazardous and solid waste processing capacity of 2,941,900 tonnes, which are expected to generate annual on-grid electricity of 6,825,844,700 kWh and an annual steam supply of 4,969,000 tonnes.
Projects in Operation (Solar Energy)
Project | Average Annual Electricity Generation Capacity (kWh) |
Total Investment (RMB Million) |
---|---|---|
Jiangsu Province | ||
Changzhou Rooftop Solar Energy Project | 4,113,000 | 60 |
Suqian Rooftop Solar Energy Project Phase I | 2,205,000 | 53 |
Suqian Rooftop Solar Energy Project Phase II | 6,198,000 | 104 |
Zhenjiang Rooftop Solar Energy Project | 11,680,000 | 143 |
Zhenjiang Ground Solar Energy Project | 4,059,000 | 70 |
Anhui Province | ||
Huaining Ground Solar Energy Project | 2,170,000 | 51 |
Germany | ||
German Ground Solar Energy Project | 3,611,000 | 68 |

Changzhou Rooftop Solar Energy Project has a designed power generation capacity of 3.70 MW. The project is located on the rooftops of some companies in the Wujin Hi-tech Zone of Changzhou City, which is the first exemplary green construction cluster and the first low-carbon demonstration park in China. It was the first to had passed the inspection test, which was conducted according to the New Guidance on Solar Energy (光伏发电新大纲), before its commencement of operation among several other solar energy projects in Jiangsu Province.

Suqian Rooftop Solar Energy Project Phase I and II has a designed power generation capacity of 8.28 MW. It is the first solar energy project in Jiangsu Province that received approval to directly proceed to grid connection.

Zhenjiang Rooftop Solar Energy Project has a designed power generation capacity of 8.70 MW. It completed construction and commenced operation in December 2010, and was the largest rooftop solar energy generation project in Jiangsu Province at the time.

Zhenjiang Ground Solar Energy Project has a designed power generation capacity of 3.5 MW. It is one of the major projects listed in Zhenjiang New Area's Eleventh Five-Year Plan. It is Jiangsu Province's largest ground thin-film solar energy project.

Huaining Ground Solar Energy Project has a designed power generation capacity of 2.00 MW. It is the first large ground thin-film solar energy project in Anhui Province. The project was among the first batch of National Golden Sun Projects.

German Ground Solar Energy Project located at Schönewalde, eastern Germany, has a designed power generation capacity of 3.7 MW. Everbright Environment acquired the project in 2011 – its first overseas investment project and the largest ground silicon-based thin-film solar energy generation system in Germany at that time. The project has been running steadily for six years with high energy efficiency, providing long-term stable electricity to the local communities.
Projects in Operation (Wind Power Project)
Project | Average Annual Electricity Generation Capacity (kWh) |
Total Investment (RMB Million) |
---|---|---|
Shanxi Province | ||
Zhaojia Mountain Wind Power Project Phase I | 230,000,000 | 417 |
Changfang Mountain Wind Power Project Phase I | 429 |

Ningwu Wind Power Project includes Changfangshan Project Phase I and Zhaojiashan Project Phase I, which have a combined designed power generation capacity of 96MW and generate 23 GWh of electricity per annum. The project followed the philosophy of "Producing Quality Projects and Building a Quality Brand" throughout the construction process. It is the only wind power project that received the "Fen River Cup Award for Construction Projects", the highest award for excellent quality construction in Shanxi Province.
Projects in Construction
籌建項目